Skip to content

Roadmap

Development phases are 0.0.x milestones, not releases: phase 0 is 0.0.1, phase 1 is 0.0.2, and so on. The version in package.json gives the last phase reached.

Phase Version Content Requirements
0 0.0.1 Skeleton, governance, design, specification
1 0.0.2 Model shim MOD
2 0.0.3 Loader, built-in registry, remote loading LOAD
3 0.0.4 Mapping of Grafana data to traits and write-back MAP
4 0.0.5 Panel component and options editor PNL
5 0.0.6 Demonstration widgets, anywidget-instruments and anywidget-automotives integration, provisioned dashboards INT
6 0.0.7 End-to-end tests, plugin validator, user documentation QA, DOC

After phase 6: feeding the graphs of anywidget-instruments-industrial from the query results (done for Sparkline, KPITile, TrendChart, WaveformChart and XYGraph; IntensityChart and the digital graphs remain), and testing under the frontend sandbox and a strict CSP.