Roadmap¶
Development phases are 0.0.x milestones, not releases: phase 0 is 0.0.1,
phase 1 is 0.0.2, and so on. The version in package.json gives the last
phase reached.
| Phase | Version | Content | Requirements |
|---|---|---|---|
| 0 | 0.0.1 | Skeleton, governance, design, specification | |
| 1 | 0.0.2 | Model shim | MOD |
| 2 | 0.0.3 | Loader, built-in registry, remote loading | LOAD |
| 3 | 0.0.4 | Mapping of Grafana data to traits and write-back | MAP |
| 4 | 0.0.5 | Panel component and options editor | PNL |
| 5 | 0.0.6 | Demonstration widgets, anywidget-instruments and anywidget-automotives integration, provisioned dashboards | INT |
| 6 | 0.0.7 | End-to-end tests, plugin validator, user documentation | QA, DOC |
After phase 6: feeding the graphs of anywidget-instruments-industrial from the
query results (done for Sparkline, KPITile, TrendChart, WaveformChart
and XYGraph; IntensityChart and the digital graphs remain), and testing
under the frontend sandbox and a strict CSP.